Last week, we wrote a blog about a particularly dynamic duo. Since good things come in pairs, we’re following up this week with another one. Institutional effectiveness and strategic planning show up together in different ways in nearly every accreditation standard, so it’s no surprise that people blur them together. We field questions about how the two connect all the time. Where does one stop and the other begin? Who hands what to whom? And what happens when a project is finished?

We recently rebuilt our website (this is not just bragging; it’s related, I promise). As higher education consultants who have written both about how critically important your website is and how to audit it, we’ll admit that becoming our own client pulled us a bit out of our comfort zone. It also handed us a tidy example of the IE and strategic planning cycle in action. So, for the rest of this blog, please welcome EduCred Services University (ESU). (Our mascot is a highly organized llama. Our fight song is still under review, but it will be a banger.)

A Quick Refresher

Institutional effectiveness (IE) is the ongoing process of measuring whether your institution is already doing what it’s supposed to be doing and producing the expected results. What does your mission promise, and are you actually delivering on that promise? You decide what those metrics should look like, collect data on a regular schedule, and act on what you find.

Strategic planning is where your institution decides where it wants to go in the future and commits resources to get there.

The two work as a loop. IE data surfaces a problem or opportunity. That finding often becomes a strategic initiative. Once the initiative is complete, it returns to IE for ongoing monitoring. Here’s how that played out for your friends at EduCred Services University.

Step 1: The Data Kept Pointing to the Same Problem

Emily, who manages EduCred Services University’s marketing and operations (and who is currently writing this and referring to herself in the third person), had been wrestling with ESU’s website platform for a while. Simple updates took longer than they should have, and some of the features she needed required clunky workarounds. Meanwhile, the IE data she tracked told a consistent story. Page load times were slow and were causing site traffic to plateau. The platform had also recently raised its prices without adding much in the way of new features. The visual design had also started to look its age.

The key detail here is time. One slow month could be a fluke. When the same metrics stay flat or get worse across several review cycles, you have a trend, and a trend is evidence.

At the EduCred Services University, our IE metrics for the website might look something like this:

Metric Benchmark 2022 2023 2024 2025
Average Page Load Time Under 2.5 seconds 2.4s 2.8s 3.6s 4.5s
Bounce Rate Under 10% 8% 9% 11% 10%
Time Spent on Content Updates Under 3 hrs/week 1.5 hrs 2.5 hrs 1.7 hrs 2.5 hrs
Accessibility Errors Flagged during Annual Reviews 0 critical errors 2 0 0 9

Small fixes during the annual website review weren’t moving these numbers in a positive direction. When your IE review produces the same results cycle after cycle, or starts showing a negative trend, that’s your signal to bring the issue to a larger conversation.

Step 2: Do Your Homework Before You Pitch

Before bringing anything to ESU’s leadership, Emily researched possible solutions. She compared a few options, such as keeping the current platform with a design refresh or moving to a new platform altogether. For each one, she outlined the problems it would solve and the likely cost and timeline.

Then she brought those options to our CEO, Susan. Susan, like most higher education leaders who are long on tasks but short on time, does not love to operate in the hypothetical. She wants real alternatives she can weigh against each other. A single proposal with no context tends to get a quick yes or a quick no, and neither one reflects much deliberation.

To borrow a phrase from Emily (who, again, is me), if you want something, make the data do the talking. A plan with completed estimates and timelines attached is going to go a lot further than a cool but nebulous idea.

Step 3: Put It in the Strategic Plan

Once Susan approved the path, the project officially became an ESU strategic initiative. They researched the full cost, planned out the timeline and owner of the task, and discussed what that investment would mean for our budget and workload. Then we pulled the trigger.

Here’s how EduCred Services University wrote this up in our strategic plan:

Goal: Redesign, replatform, and launch our website by October 1, 2026.

Actions Est. Budget Start Date Responsible Benchmark(s) Status Due Date
Select platform Staff time (Emily) Jan 2026 Emily / Susan Platform selected and approved by leadership Done Feb 2026
Audit and inventory existing site content Staff time (Emily) Jan 2026 Emily Full page inventory documented Done Mar 2026
Research other websites and choose 3 inspiration sites on the same platform Staff time (Emily) Feb 2026 Emily 3 sites identified with notes on style and flow Done Apr 2026
Select web design firm $ Apr 2026 Emily Firm selected; contract signed Done Jun 2026
Write and submit content to web designer Staff time (Emily and Susan) Jun 2026 Emily All page content delivered Done Jul 2026
Review and approve website design Staff time (Emily and Susan) Aug 2026 Emily / Susan Design approved; revisions resolved Done Sep 2026
Launch and review Staff time (Emily and Susan) Sep 2026 Emily Site live; 0 critical accessibility errors; load time under 1.5 seconds Done Oct 2026
Total Budget $

A few things worth noticing here.

This goal is written tactically on purpose. A goal like “strengthen our digital presence” sounds strategic, but nobody can tell you whether it’s on track. Writing it as a SMART goal instead gives you something you can concretely measure and monitor, which is the entire point of putting it in a plan.

The measurement component needs to live in the Benchmark column instead. Each action has something you can verify, which means, at any point in the project, you can tell whether you’re on track or not.

Notice also how often our budget column says “staff time.” Those actions may not have a direct monetary cost, but they still cost ESU something, and writing it down keeps everyone on the same page about what a project truly requires. A plan that only counts invoices will always look cheaper than it really is.

Step 4: One Owner, Many Steps

A strategic initiative that belongs to a committee belongs to no one. This one belonged to Emily, and she tracked progress against each action in the plan and kept Susan updated as things moved.

Projects like this rarely go exactly to plan, and ESU’s was no exception. A few steps took longer than expected. A couple of costs came up that nobody had anticipated. Emily documented each one as it happened with a short note about what caused it and what ESU decided to do in response. Susan approved any changes or additional costs before the project moved forward.

This kind of record feels tedious while you’re keeping it but seriously pays off when someone asks about it. If ESU’s CEO, CFO, or accreditor (because, of course our fictional university is accredited 😘) wants to know why a project ran over budget or missed a target date, Emily can hand them a clear, dated trail of decisions with leadership sign-off attached. That goes over much better than a vague memory that something came up with the vendor back in the spring.

It also makes your next project better. When Emily plans ESU’s next initiative, she’ll already know that content writing takes longer than she thinks it does.

Step 5: Back to IE, With Higher Expectations

So, the new site is live! (You’re on it right now, friend!) For some institutions, this is where the story ends. The initiative gets marked complete, everyone celebrates, and the project file goes into a drawer.

At ESU, though, the completed initiative goes right back into the institutional effectiveness plan. The website is still something we need to watch, and now we have a brand-new one to keep an eye on.

There’s one important change. Emily raised the benchmarks. We invested in a new site because we expected it to perform better, so the numbers we measure should reflect those improvements.

Metric Old Benchmark New Benchmark
Average page load time Under 2.5 seconds Under 1.8 seconds
Bounce rate Under 10% Under 8%
Time spent on updates Under 3 hrs/week Under 1 hr/week
Accessibility errors flagged in annual review 0 critical errors 0 critical errors, fixed within 10 days

This part gets skipped, but it’s really important. If you finish a major initiative and then keep measuring against the old targets, your new system will probably easily clear the targets in year one, everyone will mark it green, and nothing will improve over the next several years.

Why did ESU invest in this project in the first place? We spent money and staff time because we expected better performance. If our benchmarks stay where they were, we’re essentially using a Fabergé egg as an ashtray, or a Stradivarius as a doorstop. Both technically get the job done, but we’re missing a pretty huge opportunity to do more.

Your targets should move as your institution gets better at operations. Some metrics do have a ceiling, and that’s fine. ESU’s accessibility benchmark was already zero critical errors, and there’s nowhere better than zero to go. When you hit a cap like that, look for a different dimension to sharpen. We kept the target at zero and added a remediation window, so now we’re measuring how fast we fix problems rather than only whether they exist.

Raising the bar also gives your data somewhere to go. If the new site starts slipping past 1.8 seconds in 2027, that’s a real signal, and Emily catches it that year instead of four review cycles later when someone finally notices the site feels sluggish.

The Circle of (IE) Life

That’s the whole cycle! IE data flagged a problem that wouldn’t go away. Research produced real options, leadership picked one, and it became a strategic initiative with a single goal, a named owner, and a documented trail of decisions. When the project finished, it went back into the IE plan with higher expectations attached.

Your website does belong in your institutional effectiveness plan (I’ll die on this hill). But even if it isn’t in yours, the mechanics of this cycle don’t change. If your IE data has been flagging the same issue for a few review cycles now, that’s your cue to consider adding an initiative to your strategic planning agenda. The ESU Highly Organized Llamas™ wish you luck! And if it does turn out that you need a website redesign, we have an excellent firm with amazing people we would be happy to share with you.